Members Area

Full Version: First Ops session report
You're currently viewing a stripped down version of our content. View the full version with proper formatting.
The first 'Beta' ops session went well.
As expected we found some things to improve, and some switches to repair.
For a 35 year old layout that moved last year, the layout is in good shape.

We had 6 folks present and running.
As per prototype, we started an hour late. Smile
While not absolutely necessary, running with an engineer and conductor on each train makes things go much smoother, as one person will need to use the duck-unders when running a train.

Lots of fun.

Tuesday evenings, start time 6:00 PM.

Thomas
Thanx Thomas,

I've been to two operating sessions now and have learned a lot. I need to learn a lot more. Remember, I'm about to be out of town for as much as three weeks. See you all when I get back.